Text Size: A+| A-| A   |   Text Only Site   |   Accessibility
Spencer Creek Bridge
Project Information
This project will replace the bridge that was built in 1946 and is no longer in service due to structural problems caused by corrosion.  Traffic currently on a temporary detour bridge. 
 
The new project will be an Arch style structure with a 100 year life span.  Pedestrian paths will be constructed under the Arch to connect the Beverly Beach State Park to the beach.
 
For more information, click here.

Project Materials

  • Draft Environmental Impact Statement  (July 2004)
    Full Report: The full report is a large pdf file. We have broken it into several sections in order to make it easier for you to read and download. Please click on the following links to read or download each part of the full report. 
Part 1- Chapters 1-4      
         
Part 2- Chapter 5

Part 3- Chapter 6
 
Part 4- Chapters 7-11


  • Final Environmental Impact Statement  (March 2006)

    Full Report
    : The full report is a large pdf file (28MB). We have broken it into several sections in order to make it easier for you to read.  Each section may take some time to download.   
Part 1- Cover page, Interested Parties letter, FHWA letter, List of Acronyms, Table of Contents, Summary, Maps, and tables

Part 2- Chapter 1 and 2
Part 3- Chapters 3 through 8
Part 4- Chapters 9 through 14
Part 5 (broken down into several sub-parts)
Agency Comments
Public Hearing Comments
Newspaper Clippings, part 1
Newspaper Clippings, part 2
Public Comments via emails/letters/phone calls
Pubic Comments Transcript

Part 6- Appendix B
 
Part 7- Spencer Creek Bridge Final Section 4(f) Evaluation
and associated Section 6(f) Assessment
  

 
Page updated: October 09, 2007

Get Adobe Acrobat ReaderAdobe Reader is required to view PDF files. Click the "Get Adobe Reader" image to get a free download of the reader from Adobe.