| OTIA III State Bridge Delivery Program |
|
|
 |
| Engineering Baseline Reports |
|
Early in the OTIA III State Bridge Delivery Program, the Oregon Department of Transportation (ODOT) conducted an engineering baseline assessment for each bridge in the program. The results of these assessments were used to prepare a series of Engineering Baseline Reports. Each report summarizes information about the current bridge structure, conditions at the bridge site, the repair/replacement options evaluated, the feasible alignment option (i.e., the preferred option), construction issues and potential impacts at the site, estimated schedule and budget, and technical reference materials.

Download a sample engineering baseline report
If you would like access to the full library of these reports, please contact Marcia Martin at (503) 587-2948, marcia.martin@obdp.org.
|
|
|
|