Text Size: A+| A-| A   |   Text Only Site   |   Accessibility
Current Projects
Central Distribution Center (CDC)
Cold Box Compressor Replacement
Project Manager: Jim Poore
 
Freezer Refrigeration Unit Upgrade
Project Manager: Jim Poore
 
Install Overhead Door Safety Restraints
Project Manager: Paul Stanley
 
Central Distribution Center (CDC)

Coffee Creek Correctional Institution (CCCF)
Facility Expansion-Minimum/Medium
Project Manager: Jim Poore
 
Wireless Radio System Upgrade-EDACS/IP
Project Manager: Wayne Siver
 
Repave Roadway After Expansion Construction
Project Manager: Jim Poore
 
Coffee Creek Correctional Institution (CCCF)
 
 

Columbia River Correctional Institution (CRCI)
Standby Generator Upgrade
Project Manager: Mark Ong
 
Facility Structure Settlement Investigation
Project Manager: Paul Stanley
 
Columbia River Correctional Institution (CRCI)

Deer Ridge Crrectional Institution (DRCI)
New Prison Construction Team
Project Manager: Doug Young
 
Deer Ridge Crrectional Institution (DRCI)

Eastern Oregon Correctional Institution (EOCI)
Powerhouse to City of Pendleton Sewer Upgrade
Project Manager: Dan Howard
 
HVAC Replacement
Project Manager: Dan Howard
 
Rebuild Entry Headers
Project Manager: Dan Howard
 
Asbestos Removal
Project Manager: Dan Howard
 
Eastern Oregon Correctional Institution (EOCI)

Mill Creek Correctional Facility (MCCF)
Boiler Blowdown and Separartion Installation
Project Manager: Vern Rowan
 
HVAC Replacement
Project Manager: Paul Stanley
 
Monitoring Wells Decommission
Project Manager: Jim Poore
 
Mill Creek Correctional Facility (MCCF)

Oregon State Correctional Institution (OSCI)
Fire Protection Sprinkler System Installation
Project Manager: TBD
 
Asbestos Removal
Project Manager: Dan Howard
 
Floor Drains Reroute
Project Manager: Paul Stanley
 
Install and Upgrade Fire Alarm System
Project Manager: Mike Clayton
 
Install Additional Fire Sprinkler System
Project Manager: Paul Stanley
 
City of Salem SDC Connection
Project Manager: TBD
 
Boiler HMI Upgrade
Project Manager: Mike Clayton
 
Housing Unit #4-Door Control Upgrade
Project Manager: Mike Clayton
 
OCE Electrical Distribution Design
Project Manager: Mark Ong
 
Oregon State Correctional Institution (OSCI)
 
 

Oregon State Penitentiary (OSP)
Primary Electrical System Upgrade
Project Manager: Stephen Poage
 
Culinary Ventilation System Upgrade
Project Manager: TBD
 
Support Boilerhouse Vent Stacks
Project Manager: TBD
 
Innerconnect of Facility Fire Alarm System
Project Manager: Mike Clayton
 
Replacement of Restroom and Shower Floors
Project Manager: Paul Stanley
 
HVAC Replacements
Project Manager: Paul Stanley
 
Washpad Upgrade
Project Manager: Paul Stanley
 
Asbestos Removal
Project Manager: Dan Howard
 
Sidewalk Replacements
Project Manager: Paul Stanley
 
Parking Area Lighting Upgrade
Project Manager: Mark Ong
 
Parking Lots & Roadways Repaving
Project Manager: Paul Stanley
 
Oregon State Penitentiary (OSP)
 
 

Oregon State Penitentiary Minimum (OSPm)
Asbestos Removal
Project Manager: Dan Howard
 
Oregon State Penitentiary Minimum (OSPm)
 

Powder River Correctional Facility (PRCF)
PVC Domestic Water Pipe Replacement
Project Manager: Dan Howard
 
Powder River Correctional Facility (PRCF)

Santiam Correctional Institution (SCI)
Boiler Removal
Project Manager: Jim Poore
 
Rooftop Gas Pack Installation
Project Manager: Jim Poore
 
Roof Repair
Project Manager: Paul Stanley
 
Culinary Floor Repair
Project Manager: Paul Stanley
 
Santiam Correctional Institution (SCI)

Shutter Creek Correctional Institution (SCCI)
Above-Ground Gas Storage Tank Replacement
Project Manager: Paul Stanley
 
SCWC Building Remodel
Project Manager: Paul Stanley
 
Shutter Creek Correctional Institution (SCCI)

South Fork Forest Camp (SFFC)
Sewer  & Water System Upgrade
Project Manager: Jim Poore
 
Cistren Access Road Rebuild
Project Manager: Paul Stanley
 
Cabins & Dining Hall Roof Replacement
Project Manager: Paul Stanley
 
South Fork Forest Camp (SFFC)

Snake River Correctional Institution (SRCI)
Fire Sprinkler Installation
Project Manager: Dan Howard
 
Wireless Radio System Upgrade-EDACS/IP
Project Manager: Wayne Siver
 
Snake River Correctional Institution (SRCI)
 
 

Two Rivers Correctional Institution (TRCI)
Boiler Fire Tube Replacement
Project Manager: Dan Howard
 
Generator Load Tests
Project Manager: Dan Howard
 
Two Rivers Correctional Institution (TRCI)
 

Warner Creek Correctional Facility (WCCF)
Culinary Floor Repair/Replacement
Project Manager: Paul Stanley
 
Warner Creek Correctional Facility (WCCF)

Statewide
Kitchen Exhaust System Upgrade
Project Manager: Dan Howard
 
DOC Firing Range
Project Manager: Jim Poore
 
Energy Conservation
Project Manager: Facilities Services
 

 
Page updated: August 25, 2008

Click here to go to the Oregon Dept. of Veterans' Affairs outreach contact form

Get Adobe Acrobat ReaderAdobe Reader is required to view PDF files. Click the "Get Adobe Reader" image to get a free download of the reader from Adobe.